Ascot Air delivered the mechanical services for the Monash IVF day hospital and clinical fitout at 55 Little Edward Street, Spring Hill.
Monash IVF is one of Australia’s leading reproductive medicine providers, and this was not a standard commercial fitout. The facility includes an operating theatre, embryology and andrology laboratories, transfer and procedure rooms, a sterile setup room and recovery, so the HVAC specification called for the same technical rigour as a hospital operating suite.
Each critical space is held between 30 and 60% relative humidity, with the operating theatre controlled between 18 and 24°C and the laboratories, procedure rooms and recovery between 21 and 24°C. On the roof, Ascot Air installed the air cooled heat pump chillers, air handling units and associated services.
Services provided
Air cooled heat pump chillers
Air handling units
Chilled water pipework
Operating theatre air conditioning
Embryology and andrology laboratory air conditioning
Temperature and humidity control to critical spaces