Category

Recent News

Building G-14 Griffith University, Gold Coast Mechanical Services

By | Recent News | No Comments

Ascot Air recently completed a mechanical services project at Griffith University‘s Gold Coast Campus. We worked with Better Build Constructions on the state of the art Laser Printing Labs in Building G14.

The laboratories house specialised 3D printing equipment for the Bachelor of Industrial Design program. This includes a furnace room and 3D printing facilities.

Ascot Air delivered pressure controlled cooling, heating and dehumidification to AS3666:

  • Chilled Water Air Handling Units
  • Packaged Electrode Boiler Steam Humidifiers & Piping
  • Steam Manifold & Stainless Steel Ductwork
  • Nederman articulated arm extraction system
  • Industrial grade ARGON Gas System
  • Compressed Air System

We are proud to deliver a project that will deliver students a hands-on job ready education. A great article about the program and the part it plays in 3D printing innovation can be found here.

Greenslopes Hospital

By | Recent News | No Comments

Ascot Air were contracted to carry out the base building upgrade of the Jesse Vasey wing, which involved the refurbishment of the Main Central Zone AHU complete with new Chilled Water Coils, 10 No. Plug fans in lieu of the existing centrifugal supply fan. Other services included 2 x New Perimeter AHU’s commissioned to provide 100% outside air with chilled water pipework, steam pipework, controls and commissioning. We also provided booster pumps to the main chilled water plant in the basement of the Jesse Vasey Wing and room upgrade including Variable Air Volume boxes and controls additions.

See project detatils

Redcliffe Cancer Care MBICC

By | Recent News | No Comments

Ascot Air were contracted to carry out the refurbishment of the existing Redcliffe Hospital Cancer Care Building . The project involved works to levels 2, 3 & 4. Particular challenges included the integration of  new VRV Air conditioning system with the existing Mechanical services systems installed over a decade ago, Ascot Air integrated seamlessly with the existing systems and the BMS controls.

See project details

Caboolture Hospital

By | Recent News | No Comments

Ascot Air were contracted to carry out the new Mechanical installation for the new Caboolture Hospital Emergency Department. The project included the co-ordination of the Mechanical services within the restricted ceiling space, Ascot Air provided a full 3D Model of services to ensure an accurate installation

See project

480 Queen Street

By | Recent News | No Comments

Ascot Air have completed a number of successful fit out projects in the 32 Level Premium grade Green Star office building. Working across six individual projects and five principal contractors we have delivered 11 floors of high grade fitout. Particular difference to most other Brisbane high rise buildings was the inclusion of Active and Passive chilled beams incorporating many km of reverse return pipework, controls.

Jupiters Casino – Garden Kitchen & Bar

By | Recent News | No Comments

The new Garden Kitchen & Bar involved a significant extension to the an area previously occupied by The PA Pub. As part of the works, a side of the building was removed to create an open, indoor/outdoor space incorporating back of house facilities, Kitchen, Dining, Bar and Amenities. The mechanical works was particularly difficult due to the complicated ductwork arrangement above the Kitchen area to cater for significantly large Exhaust hoods, Kitchen Ventilation and air conditioning, all within limited ceiling space.

View the full project details here

H&M

H&M

By | Recent News | No Comments

Ascot Air were an integral part to the completion of the fast track fit-out of their flagship store in Queen Street Mall, Brisbane. The project consisted of well over a kilometre of flangless linear slot diffusers which gave a unique visual appearance to the store.

View the full project details here.

ISO 9001 Certified

By | Recent News | No Comments

Ascot Air are pleased to announce that we have received ISO 9001 certification of our Quality Assurance procedures. Over recent years we have spent much time and effort in refining our QA procedures and invested in many other systems including web based job and asset management software. The time has now come to gain certification as the final stage in this process.

Quality-ISO-9001-PMS302